How much notice does Superior Safety Codes require when I am ready for an inspection?

We request that you give at least two (2) days notice for proper scheduling.

Show All Answers

1. When do I need a permit?
2. What are the benefits of obtaining a permit?
3. Who can I call if I have a question about my construction project?
4. Is there a difference between a development permit and a building permit?
5. What other permits do I require?
6. Who should apply for the permits, me or my contractor?
7. What services do I get with my permit?
8. How long are my permits valid?
9. I have obtained my permits, now I have decided not to proceed with my project; can I get a refund?
10. How much notice does Superior Safety Codes require when I am ready for an inspection?
11. I am building a garage; can I build it on a slab?
12. I am moving in a manufactured (or modular) home. Do I need a building permit?
13. I have an older home that requires updating. Do I need to re-wire/re-plumb the entire house to meet today's standards?
14. I am installing a new furnace in my home, do I require a permit?
15. I am building a deck; do I need a permit?
16. I am constructing a pole shed, do I need a building permit?